Morningline LeadsGet a free sampleFree sample
Chicago, IL

Shops at North Bridge gets its facade permit for the $40 million Mag Mile makeover

Chicago issued a $12 million permit on Nov. 20 to rebuild the Michigan Avenue front of the Shops at North Bridge, the exterior half of a $40 million makeover the mall's new owner started this summer.

By Morningline Research · November 26, 2026
Shops at North Bridge gets its facade permit for the $40 million Mag Mile makeover
Graphic: Morningline Research

The City of Chicago issued a building permit on Nov. 20 to rebuild the front of the Shops at North Bridge, the Nordstrom-anchored mall at 520 N. Michigan Ave. in Illinois' biggest city. The permit covers a new vestibule on the Michigan Avenue facade, structural and mechanical, electrical and plumbing work, and ceiling work over the sidewalk on the Grand Avenue and Rush Street side. Its reported value is $12 million.

It's the second big permit for the mall this year. Together the two put the city's go-ahead on both halves of a makeover the owners have priced at $40 million.

Inside first, then the street

Timeline of permits and reported milestones for the Shops at North Bridge, 2024 to 2027
Graphic: Morningline Research, from city building permit records and the reporting linked in this story.

The interior came first. A permit issued July 20 covers renovations to the common areas and restrooms on five levels of the mall, from the lower levels up to the fourth floor. Its reported value is $10 million.

Get today’s Chicago report for your trade, free →

The new permit picks up where that one stops. It says the facade work is "in conjunction with" the interior permit, with "no change in occupancy, no change in use." The mall stays a mall. Both values are estimates filed with the city, not contract amounts, and together they come in below the $40 million figure in the news coverage.

That order matches the plan. Construction would start in August with the interior, and the exterior facade would be finished in 2027, according to the August announcement from Centennial, the mall's management company. Stores stay open while the work goes on.

A glass front with an LED arch

The 520 N. Michigan Ave. entrance with its Nordstrom sign, photographed in 2007
The 520 N. Michigan Ave. entrance with its Nordstrom sign, photographed in 2007. Photo: TonyTheTiger at English Wikipedia, CC BY-SA 3.0, via Wikimedia Commons (cropped).

The Michigan Avenue entrance gets a new glass facade with a backlit LED archway display, the Chicago Sun-Times reported. The Grand and Rush entrance gets digital displays, new lighting and finishes. Inside, the central atrium becomes a gathering space under a suspended sculpture, with a bar and lounge.

The design is by the Chicago firm ParkFowler Plus, Chicago YIMBY reported. The new bar replaces a pop-up space at the current entrance, and the main corridor gets wood slats, lighter panels and more lighting.

Luke Molloy of CBRE, which handles leasing, called the mall "one of the greatest comeback stories in Chicago retail history," the Sun-Times reported.

From the lender's hands to a rebuild

The mall opened in 2000 and spreads across six city blocks, NBC Chicago reported. YIMBY puts its retail space at more than 670,000 square feet.

In December 2024, the Alaska Permanent Fund surrendered the property to its lender, according to Crain's Chicago Business and CoStar reports cited on Wikipedia. That lender, Pacific Life, is now the owner and is paying for the renovation, according to the August announcement and REBusiness.

The biggest new name is Nike. The company is moving its Michigan Avenue flagship from 57,000 square feet into a two-level, 43,000-square-foot space at North Bridge, the Sun-Times reported in October. In August, YIMBY described the Nike move as early plans, in the former Forever 21 space.

One detail differs between the records and the coverage. The city permit describes a five-story mall building, while the August announcement calls it a four-level shopping center.

Michigan Avenue is filling back up

The mall's rebuild is part of a wider turn on the street. Retail vacancy on North Michigan Avenue fell to 25.8% in October from 33.8% in 2025, according to Kirsch Agency figures reported by the Sun-Times. "We're watching a very, very fast recovery," Greg Kirsch, the firm's managing broker, told the paper.

Nationally, retail stood out last month. The Dodge Momentum Index of projects in planning fell 9% in October and commercial planning dropped 13.4%, but retail was the only category to gain, Construction Dive reported.

With the interior permitted in July and the facade permit issued last week, the whole North Bridge project now has its permits. The new Michigan Avenue front is due in 2027.

See all of Chicago's latest permit numbers, updated weekly.

Want to wake up knowing what’s being built near you?

Tell us what you do and where, and we’ll send you a free sample report.

Your report comes from dave@morninglineleads.com, so please check your spam or junk folder if you don’t see it. Free, no card, no obligation. We work with one company per trade in each area, so if yours is taken, we’ll let you know.

Sources

More from Morningline Research

More numbers: Chicago, IL building permit activity, updated weekly.